Fuselage Boom Assembly Begins
Now that parts inventory and preparation have been completed the fuselage boom assembly can commence. We started by locating all of the parts necessary for assembly. The bulk heads were fastened to the boom sides as outlined in the instructions.
This was followed by attaching the top and bottom skins to the boom. We ran out of cleco fasteners in short order and had to wait a couple of days for more to arrive. The additional cleco’s allowed us to fasten all of the parts that comprise the fuselage boom although we still did not have enough to fill every hole that would need to be riveted.
The next step will be to fasten all remaining 1/8″ holes and then double check the fitment prior to starting the riveting process. We don’t want to have to drill-out any incorrectly placed rivets.