Building Egress Test #2

With both upper and lower keel tubes now part of the fuselage frame the full length of the fuselage is known. Bolting it to the tail boom and empennage gives the full length of the aircraft which now allows us to determine if the assembly can be removed from the building. The partially assembled aircraft also allowed for a photo op.

Previous
Previous

More Fuselage Frame

Next
Next

Forward Fuselage Frame