Will it Fit?

We are currently building the airplane on the 3rd Floor Project Space of the Sullivan Center. It’s a perfect space for such an endeavor with only one real potential drawback. Not having access to a set of hangar doors we will periodically have to check if the air frame sub-assemblies will fit through the stairwell. As the plane grows in size we will perform ‘extraction’ tests. The video below depicts our first test with the fuselage boom. So far so good.

Visit https://e-hawk.org/ for more information.

Previous
Previous

Thinking About Batteries

Next
Next

Wing box Tacked